02.07.2020

Overhead factor

Project controlling with Kobold Control allows architects and engineers to make reliable predictions about the expected total cost ­volume at an early stage. At the start of the project calculation, all cost elements to be taken into account are included. The system automatically splits personnel costs into cost-unit costs and overhead costs. Once a month, figures from the business management analysis such as premises costs, insurance costs and vehicle costs are transferred. The overhead factor is calculated dynamically over a period of several months and is updated continuously. Until the end of June, Kobold has a number of special offers, including a Small Business Version of Kobold Control, but with a paid maintenance contract.

www.kbld.de

https://detail-cdn.s3.eu-central-1.amazonaws.com/media/catalog/product/K/o/Kobold_Budgets-Gant-teasergross_1.jpg?width=437&height=582&store=de_en&image-type=image https://detail-cdn.s3.eu-central-1.amazonaws.com/media/catalog/product/K/o/Kobold_Budgets-Gant-teaserklein_1.jpg?width=437&height=582&store=de_en&image-type=image
Copyright © 2024 DETAIL. All rights reserved.