Search results for: 'heftarchiv/jahrgange/1976'
- Did you mean
- heftarchiv jahrgange 1970s
- heftarchiv jahrgange 194x
-
Athletics in the nature park
Extension of the Pierre-Paul-Bernard Stadium in B...K Architectures have completed the renovation and extension of the Pierre-Paul-Bernard Stadium in Talence. The new sports complex blends harmoniously into the protected forest of Thouars.
-
Cube clad in natural stone
Extension for Kunsthaus Zürich by David Chipperfi...David Chipperfield Architects' extension has doubled Kunsthaus Zürich in terms of area, making it the largest art museum in Switzerland.
-
Mit der Europazentrale für Sony Music in Berlin-Schöneberg haben Gewers Pudewill Architekten eine 8000 m2 große Nachkriegslücke geschlossen.
-
In their redesign of the Biodome, the Kanva architecture studio have concealed built-in fittings behind membrane walls and returned the architecture of the 1976 Olympic velodrome to centre stage.
-
The Canadian Centre for Architecture (CCA) shows how radical architectural utopias from the 1960s and 1970s remain relevant today.
-
The Canadian Centre for Architecture (CCA) shows how radical architectural utopias from the 1960s and 1970s remain relevant today.
-
Single-wythe brickwork – and not a thermal insulation composite system – lies behind the rendered facade of a Berlin apartment building designed by Bruno Fioretti Marquez.
-
An extensive exhibition on Brutalist architecture will be opening on 9 November 2017 at the German Architecture Museum in Frankfurt.
-
The cathedral in Créteil, located just southeast of Paris, was a flat-roofed, single-storey structure until three years ago.
-
It had been presumed lost, but this fall a legendary interior designed by Hermann Czech for a baroque palace in the heart of Vienna found its way back into the spotlight.
-
The American Institute of Architects (AIA) honored the enduring significance of the metro’s design from the 1960’s by Harry Weese.
-
A large office complex on the banks of river Seine has been extended by an amenities wing. In a project of glass micro-architecture the lobby has been re-designed also.
-
Shakespeare is not on the programme at the moment, but the show must go on at the London National Theatre – despite of refurbishment works.
-
This terraced structure, built in 1976, had become uneconomical due to sub-standard building physics and energy technology.